  • EPS線條施工中的环境条件要求
  • 本站編輯:含羞草v影院发布日期:2019-08-08 17:12 浏覽次數:

不得在冬季低溫情況下施工,施工溫度不低于5℃,5級以上大風和雨霧天不得施工,如需要此條件下加工並安裝的,EPS輕體構件面層及永定特制粘接膠必須加以抗凍成份的特制原料才可。否則會出現龜裂,耐水性下降,嚴重影響了整個系統的質量。


Construction shall not be carried out at low temperature in winter, construction temperature shall not be less than 5 C, and construction shall not be carried out in gale and fog days of grade 5 or above. If processing and installation are required under such conditions, the surface layer of EPS light-weight components and the special adhesive of Yongding must be made of special raw materials with anti-freezing ingredients. Otherwise, cracks will occur, water resistance will decline, seriously affecting the quality of the whole system.

基層表面不宜過于幹燥,清除基層表面的油汙、脫模劑等妨礙粘結的附著物,凸起、空鼓和疏松部位應剔除並找平,不得有脫層、空鼓、裂縫。同時不需要將牆面潤濕,面層不得有粉化、起皮、爆灰、返堿現象。在舊樓改造時,徹底清除原基層的塗膜,原飾面磚的虛粘空鼓部分,過于光滑部位做打磨處理。


The base surface should not be too dry, remove the oil dirt, demoulding agent and other attachments that hinder the bonding of the base surface. The protruding, empty drum and loose parts should be removed and leveled, and no delamination, empty drum or crack should be found. At the same time, there is no need to wet the wall, and the surface should not be powdered, peeled, explosive ash, alkali return. When the old building is rebuilt, the original base coatings are thoroughly removed, the empty viscous and empty parts of the original facing bricks are polished on the overly smooth parts.

不管選用什麽材料,都要注意一些小特性,比如環境因素跟其他人爲因素,以確保裝修能正常進行。


Whatever material you choose, you should pay attention to some minor features, such as environmental factors and other human factors, to ensure that the decoration can proceed normally.

EPS線條安装规范说明


Specification for Installation of EPS Lines

EPS線條安装规范说明:安装工人首次安装作业,必须在公司驻现场工程师指导下进行。


EPS Line Installation Specification: Installation workers'first installation operation must be conducted under the guidance of the company's on-site engineers.

一、施工工具


I. Construction Tools

2-160G5155239-51.jpg

鋸條、手鋸、卷尺、角尺、抹子、壁紙刀、剪刀、托線板、2m靠尺、掃帚、灰刀、電動攪拌器、鋼絲刷、墨鬥、砂紙、切割造型所用電熱絲等。


Saw blade, hand saw, tape ruler, angle ruler, wiper, wallpaper knife, scissors, supporting board, 2m ruler, broom, grey knife, electric mixer, wire brush, ink bucket, sandpaper, electric heating wire for cutting moulding, etc.

二、施工工藝


II. Construction Technology

1、待施工安裝牆面,窗門洞口等其他施工程序已經完成並驗收合格。


1. Other construction procedures, such as wall surface, windows, doors and openings, have been completed and accepted.

(1)基層清理。


(1) grass-roots clean-up.

①清理混凝土牆面上殘留的浮灰、脫模劑油汙等雜物及抹灰空鼓部位等。


(1) Clean up the residual floating ash, oil stain of demoulding agent and the empty part of plastering on the concrete wall.

②剔除牆面接槎處劈裂的混凝土塊、夾雜物、空鼓等,並重新進行修補;窗台挑檐按照2%用水泥砂漿找坡,外牆各種洞口填塞密實。


(2) Remove the splitting concrete blocks, inclusions and empty drums at the wall joints, and repair them again; the eaves of windowsills are found by 2% cement mortar, and all kinds of openings of external walls are packed tightly.

③要求粘贴聚苯板表面平整度偏差不超过4 mm,超差时对突出墙面处进行打磨,对凹进部位进行找补(需找补厚度超过6 mm时用1:3水泥砂浆抹灰,需找补厚度小于6 mm时由保温施工单位用聚合物


(3) The surface flatness deviation of pasted polystyrene board should not exceed 4 mm. When the surface flatness deviation exceeds 4 mm, the protruding wall surface should be polished and the concave part should be repaired. (1:3 cement mortar should be used to plaster the concave part when the thickness exceeds 6 mm, and polymer should be used by the thermal insulation construction unit when the thickness is less than 6 mm.)

黏结砂浆实施找补);以确保整个墙面的平整度在4 mm内,阴阳角方正、上下通顺。


The bonded mortar is used to find and mend the wall to ensure that the evenness of the whole wall is within 4 mm, and the Yin and Yang angles are square and smooth up and down.

(2)配制砂漿。


(2) Preparing mortar.

①施工使用的砂漿分爲專用黏結砂漿及面層聚合物抗裂砂漿。


The mortar used in construction is divided into special bonding mortar and surface polymer anti-cracking mortar.

②施工时用手持式电动搅拌机搅拌,拌制的黏结砂浆质量比为水:砂浆=1:5,边加水边搅拌;搅拌时间≥5 min,搅拌必须充分、均匀,稠度适中,并有一定黏度。


(2) When mixing with hand-held electric mixer, the quality ratio of bonded mortar is water: mortar = 1:5, mixing with water; mixing time is more than 5 minutes, mixing must be full, uniform, moderate consistency and a certain degree of viscosity.

③砂浆调制完毕后,须静置5 min,使用前再次进行搅拌,拌制好的砂浆应在1 h内用完。


(3) After the mortar has been prepared, it must be kept for 5 minutes, stirred again before use, and the mixed mortar should be used up within 1 hour.

(3)在粘貼聚苯板前,在聚苯板粘貼面薄薄塗刷一道專用界面劑,可增強聚苯板與黏結砂漿的結合力;待界面劑晾幹後方可塗抹聚合物黏結砂漿進行牆面粘貼施工。


(3) Before bonding the polyphenyl board, a special interfacial agent is applied on the bonding surface of the polyphenyl board, which can enhance the bonding force between the polyphenyl board and the bonding mortar; after drying the interfacial agent, the polymer bonding mortar can be applied on the wall for bonding construction.

(4)预粘板端翻包网格布在飘窗板、挑檐、阳台、伸缩缝等位置预先粘贴板边翻包网格布,将不小于220 mm宽的网格布中的80 mm宽用专用黏结砂浆牢固粘贴在基面上(黏结砂浆厚度不得超过2 mm)


(4) Pre-bonded plate end turning-over grid cloth is pre-pasted in the position of floating window board, eaves, balcony, expansion joint, etc. 80 mm wide of grid cloth less than 220 mm wide will be firmly pasted on the foundation with special bonding mortar (bonding mortar thickness shall not exceed 2 mm).

2、根據施工圖紙,在待安裝EPS構件的部位彈出定位線(中線或邊線)。


2. According to the construction drawings, the positioning line (midline or edge line) is popped up at the part where EPS components are to be installed.

3、根據圖紙安裝尺寸切割EPS構件。EPS構件均爲標准尺寸,切割時要考慮拼接縫寬。


3. Cut EPS components according to drawing installation size. EPS components are of standard size, and splicing seam width should be considered when cutting.

4、EPS構件粘貼時,網格布應當翻包,如有特殊情況可直接粘貼不翻包。聚苯EPS構件粘結劑使用優質粘結砂漿,采用薄層滿粘法進行粘貼,用力擠壓EPS構件使砂漿從周邊溢出,粘接縫寬不大于3mm


4. When pasting EPS components, the mesh cloth should turn over the package. If there are special circumstances, it can paste directly without turning over the package. Polyphenylene EPS component binder uses high quality bonding mortar, uses thin layer full bonding method to bond, and extrudes EPS component forcefully to make mortar overflow from the periphery, the bonding joint width is not more than 3mm.

。粘結縫應隨粘隨勾,灰縫飽滿,並保持EPS構件表面的整潔。


。 The bond seam should follow the bond, the grey seam should be full, and the surface of EPS components should be kept clean.

5、對于較大EPS構件,安裝時要求設置支撐進行臨時固定。


5. For larger EPS components, temporary fixing of support is required during installation.

6、安裝時,若需拼接,應事先測量好拼裝尺寸和角度,並在平整地方進行預拼裝,縫隙不大于3mm。用優質粘結砂漿作拼接粘結材料,砂漿稠度可稍大些,采用薄層滿粘法進行。拼接時要求稍微、


6. When assembling, if splicing is needed, the size and angle of assembling should be measured in advance and pre-assembling should be carried out in the flat place, with the gap not more than 3mm. Using high quality bonded mortar as splicing bonding material, the consistency of mortar can be slightly higher, and the thin layer full bonding method is adopted. Slightly required for splicing.

均勻用力擠壓錘打,以使灰縫滿足要求。


Equilibrium force extrusion hammering, so as to meet the requirements of the ash seam.

7、拼接完灰縫應用灰刀勾平,使EPS構件成爲一體。幹燥後,若EPS構件拼縫處留有多余粘結砂漿可用砂紙進行打磨。


7. After splicing, the gray knife is used to flatten the gray seam, so that the EPS components can be integrated. After drying, if there is excess bonded mortar left at the joint of EPS components, it can be polished with mortar paper.

8、幹燥後,EPS構件拼接部位采用EPS構件抗裂專用膠進行處理。處理方法見抗裂專用膠使用說明。


8. After drying, the splicing parts of EPS components are treated with special anti-cracking adhesive for EPS components. The treatment method is shown in the instructions for the use of the special anti-cracking adhesive.

9、拼縫處理:粘接縫寬不大于3mm時,在安裝完的次日進行拼縫的砂紙打磨處理,使用優質罩面砂漿粘貼100mm寬玻纖網格布,厚度小于2mm;粘接縫寬大于3mm時,縫內用薄聚苯片填塞後,再使用優


9. Sewing treatment: When the bonding seam width is not more than 3mm, sandpaper polishing treatment is carried out on the next day after installation, and 100 mm wide glass fiber mesh cloth is pasted with high-quality cover mortar, the thickness is less than 2mm; when the bonding seam width is larger than 3mm, thin polyphenylene sheet is used to fill the seam, and then excellent use is obtained.

質罩面砂漿粘貼100mm寬玻纖網格布加強。幹燥後,若線腳拼縫處留有多余砂漿處理方法同上。


The quality cover mortar is strengthened by pasting 100mm wide glass fiber mesh cloth. After drying, if there is excess mortar left at the joint of thread foot, the treatment method is the same as above.

10、施工完的EPS構件就注意成品保護,嚴禁蹬踏、重物撞擊。如有損壞,應將整塊EPS構件剔除重裝。


10. After the construction of EPS components, attention should be paid to the protection of finished products, and pedal and impact of heavy objects should be strictly prohibited. In case of damage, the whole EPS component should be removed and reassembled.

三、注意事項


1、施工時環境溫度應不大于38℃,不低于5℃,低于此溫度時粘結砂漿必須采用抗凍配方。風力不大于5級。


 2、安裝、切割EPS構件前,牆面不需灑水濕潤,粉塵、汙漬等影響粘結強度雜物應清理幹淨。

3、拼裝時,拼裝縫應盡量留于整根EPS構件中間部位。


4、粘結EPS構件時,砂漿用水按推薦加水量進行。但拼接時砂漿加水量應較推薦用量在1~2%。

5、剛粘結的EPS構件應注意保養,防止雨水沖刷、人爲損壞等。